Project Management and System Solutions

System Integration and Interface Management

Infrastructure, superstructure, and electromechanical works (including signalling, telecommunication, power supply systems, catenary and TPS systems, passenger information, announcements, access control, SCADA, ventilation, and fire control systems) are collectively executed in railway, large industrial buildings, and airport applications. In the management of such complex projects, two main challenges arise:

  • Given the impossibility for the contractor to employ experienced personnel for all electromechanical systems, the planning, design, and timely completion of various works concurrently pose a challenge in every project.

  • The interfaces between different disciplines are incomplete and inaccurate, as various suppliers make efforts to safeguard their own budgets. This results in a system that does not effectively perform all functions.

Solution: The management of such large and complex projects should be entrusted to a dedicated professional team rather than multidisciplinary vendors.

This specialized team will define the project design, interfaces, and establish the project boundaries. It will coordinate all aspects of the project, including interfaces, and oversee the execution of applications by suppliers selected in accordance with the project specifications.

Elsitel with our experienced team completely fulfils the works mentioned above in theproject management; in addition to these,   we performthe following works within this scope.

  • Preparation of projects concerningthe works

  • Preparation of work schedule
  • Management of project integration
  • Management of project documentation

  • Management of interface
  • Preparation of logistics programs
  • Price Research and Supply of Materials

  • Follow-up of Customs Procedures
  • Management of Depot-Logistics-Materials

  • Follow-up and Control of the Construction
  • Management of Testing and Commissioning
  • Management of the project within the warranty period