Wayside Signalling and Telecommunication Works in Torbalı-Ödemiş- Çatal-Tire Line Section Within the Scope of National Signalling Project

  • The material supply, installation, testing and commissioning works of the signalling, telecommunication and support systems of the approximately 70 km long double track railway line between Torbalı Ödemiş Çatal Tire with a maximum train operating speed of 160 km/h will be carried out under the responsibility of Elsitel.

  • Automatic Train Protection System that will be implemented along the line will be ERTMS / ETCS Level 1.

  • The systems to be installed as part of the project are as follows:

  • Power Distribution System in Technical Buildings: 12 sets

  • Signal : 122 units
  • Point Machine : 36 units
  • Track Circuit : 86 pieces
  • Technical Building : 12 units
  • Level Crossing : 26 units

  • Cable Trench : 76 Km

  • Power Cables : 77 Km

  • Signal Cables : 234 Km
  • Communication Cables : 186 Km

  • Indoor – Outdoor Telephones : 172 units

  • CCTV and Fire Alarm Systems