Tbilisi Metro Rehabilitation Project

  • Cable and Accessories Design, Supply and Installation Works Contract-LOT-1

  • The Lot-1 Contract encompasses the design, supply, and installation of all medium voltage (MV), traction power supply (TP), and low voltage (LV) cables and accessories on the Akhmeteli-Varketili line, with a total length of 20.1 km and 16 stations and the Saburtalo line, with a total length of 7 km and 6 stations. Additionally, it includes the removal of old cables and accessories on both lines.

  • TWF and Accessories Design, Supply and Installation Works Contract – LOT-2

  • The Lot-2 Contract encompasses the dismantling of 28 old tunnel ventilation fans (TVFs) and their accessories, as well as the design, supply and installation of 32 new tunnel ventilation fans (TVFs) and their accessories on the Akhmeteli-Varketili and Saburtalo lines.