Wayside Signalling and Telecommunication Systems Completion Work for Afyonşehir (Excluding) – Karakuyu (Excluding) Line Section

  • The design, engineering, procurement, supply, erection, installation, testing, and commissioning of signalling and telecommunication systems, ensuring the safe and efficient operation of railway traffic at train speeds up to 160 km/h (inclusive), are being conducted under the responsibility and scope of Elsitel as the main contractor, for the railway line section from Afyonşehir (excluding) to Karakuyu (excluding).

  • The systems to be installed within the project scope are as follows:

  • Technical Buildings : 9 units

  • Monoblock Concrete Pavilions: 12 units

  • Power Distribution System: 9 sets

  • Signals : 115 units
  • Switch Engine : 34 units
  • Track Circuit : 89 sets

  • Level Crossing : 29 units

  • F/O Cables : 120.963 meters
  • Signal Cables : 126.742 meters
  • Communication Cables : 52.305 meters

  • Power Cables : 41.056 meters

  • Indoor – Outdoor Telephones: 123 units

  • SDH Network Communication System

  • Burglar, Fire Alarm Systems

  • Uninterruptible Power Supply System

  • Point Heating System

  • Automatic Train Stopping System (ATS)