Riyadh Metro Project, Installation and Testing of Interlocking Cabins Construction Work (T.R.I.P)

  • The Riyadh Metro line is a 176 km-long project with 85 stations. In this context, our company has taken on the configuration of the anchoring system to be utilized for the Yellow Line (4), Green Line (5), and Purple Line (6).

  • The project includes the installation of the following systems:

  • In field rooms of identical size and dimensions, cabinets for the interconnection system were installed. Internal cables were then connected between these cabinets, followed by cold and hot cable tests.

  • After the wiring was completed, the cabinets were energized and the cabinets themselves underwent hot tests.

  • After the test and commissioning team completed their tests, all cables and cabinets were gathered and prepared for shipment to the field, then delivered to the warehouse.