Polatli-Konya HSR Line, Catenary Systems and Substations Maintenance and Repair Works

  • All kinds of malfunctions and damages, maintenance, repair, measurement and testing works of the electrification systems on the High Speed Train Line between Ankara and Konya are carried out by Elsitel teams as the main contractor.