Marmaray Project, Signalization and Telecommunication Systems Construction Work

  • The installation of CBTC and ERTMS Level 1 Train Control System on the mixed traffic line (commuter + high speed line) between Gebze and Halkalı (Istanbul), which connects Asia and Europe via a railway tunnel under the Bosphorus, is carried out by Elsitel. The line spans 76 KM and comprises 42 stations, 4 depot areas, 1 OCC, and 1 BOCC. Elsitel has installed all trackside and indoor signalling equipment.

  • The project includes the following work items:

  • Wayside Signals
  • Point Machine

  • Track Circuits

  • CBTC
  • ETCS

  • Cable Laying, Splice, Measurement and Termination

  • Equipment Assembly & Verification

  • Electronic Interlocking

  • Depot & Logistics

  • Elsitel has 42 stations and 4 depot sites, where the design, procurement, implementation, testing, and commissioning of the following systems are realized.

  • Access Control

  • Telephone System

  • TETRA Radio System

  • GSMR

  • Communication Control Center, DUTS

  • UPS Systems

  • Power Distribution Systems

  • Transmission System

  •  Fiber Optic Backbone