Marmaray Project, Signalling and Telecommunication Systems Maintenance and Repair Works
Maintenance of signalling systems on Marmaray Project’s BC1 section was carried out by Elsitel between 2014-2020. From early 2019 Elsitel have shouldered both Signalling and Telecommunication systems on Gebze-Halkalı CR (commuter-rail) and IC (inter-city) lines.
The subsystems within this scope include:
Signalling Systems
- CBTC, ERTMS/ETCS Level 1 Onboard and Wayside, Track Circuits, Point Machines, Wayside Signals, Interlocking
Telecommunication Systems
Fiber Optic Backbone, IP/MPLS Transmission, Public Address Announce, TETRA, GSM-R, Multi-functional Telecommunication, Access Control, PABX, Power Supply, UPS and Administrative LAN Systems
