High Speed Train Sets ERTMS/ETCS Level 1 and 2 ON-BOARD Assembly, Test and Commissioning Works

  • Installation, cabling, and static and dynamic tests for ERTMS/ETCS Level 1-2 On-Board Systems were conducted on 12 High-Speed Train sets.