  • Within the project scope, the superstructure and electromechanical works for the 450 km double-track railway and a 6 km long airport connection line between Mecca and Medina, designed for an operating speed of 330 km/h, have been successfully completed. Additionally, significant elements of the project include the supply of 35 train sets, maintenance works spanning 12 years, and the establishment of 2 Maintenance and Depot facilities in Mecca and Medina.

  • Within the scope of the project, our company assumed responsibility for the installation, connection, testing, and commissioning of internal and external signaling systems along the railway track and within technical buildings.

  • Interlocking System,
  • Wayside Signal,
  • Junction Box Testing and Termination Works,

  • Track Circuit Assembly,

  • Axle Counter Assemblies,

  • Point Machines,

  • End Position Detector Assemblies,

  • OCC and BOCC Command Center System,

  • Local Command Desk,

  • Local ERTMS/ETCS Desk,

  • Wayside ERTMS and Information Sign,

  • Interconnection Systems Suitable for CPS1 and CPS2 Enterprises