Bandırma-Balıkesir, Manisa-Menemen Project, Signalling and Telecommunication Systems Construction Work

  • The scope includes the installation of signalling and telecommunication systems for the 340 km conventional railway line between the cities of Bandırma and Menemen, designed for a speed of 160 km/h.

  • Elsitel is responsible for installation of all signalling systems, construction of central control building and 30 technical buildings and installation of all wayside cable conduits.

  • Within the project scope, installations of signalling equipment, construction of 18 technical buildings, and the establishment of the CTC control center building were completed for the 163 km railway line between Susurluk station and Karaağaçlı.