Bandırma-Bursa-Yenişehir-Osmaneli High Standardized Railway Electrification Systems, Construction of Catenary Systems and Substation Centers
Bandırma Bursa Osmaneli Yenişehir line has been constructed in accordance with a speed of 250 km/h and the route length is 201 kilometres. In addition, it is planned that high speed passenger trains will operate at a maximum speed of 200 km/h and freight trains at a maximum speed of 100 km/h.
Elsitel has undertaken the construction of the catenary systems of the first phase of the 57 km double track Bursa-Yenişehir line section.


The systems to be installed within the scope of the project are as follows:
- Steel catenary masts, H profile, 2.500 tonnes (3.846 pieces)
Construction of foundations of the catenary poles and anchorages
Contact wire, 120 mm2, CuAg 0,1 (206 km)
- Messenger Wire 70 Bz II (206 km)
Return Conductor OSTRICH 176,9 mm2 Al/St
Feeder conductors
- Cantilevers (made of aluminium pipes)
- All catenary materials and accessories, including droppers, Y ropes, mipoint anchors, automatic tensioning devices for main line and for tunnels, etc.
Section isolators
Neutral zones, station posts, turnout posts
Disconnectors, circuit breakers, protection devices
Connection to the transformer substations